The City of Clearwater implemented a new, easy way of obtaining the bid packages for advertised projects, using this web site. We also provide the information about the Closed Bid Tabulation at the bottom of this page after the bid opening date.
Obtaining Project Plans, Specifications & Bid Packages
Purchasing Division Bid/RFP/RFQ packages
Please read the Doing Business with the City of Clearwater information. The following Bid/RFP/RFQ packages are presented below as Adobe® PDF documents, which you may download, complete, and return to: Purchasing Officer, Purchasing Division of the City of Clearwater, P.O. Box 4748, Clearwater, Florida 33758
| Project Title |
Date Available |
Pre-Bid Conference |
Opening Date/Time |
Date of Award |
Notes |
Plans & Specs |
ONSITE MEDICAL SERVICES (RFP 14-09) |
6/29/2009 |
Recommended: 7/10/2009 3:00 PM Municipal Services Building
100 South Myrtle Ave.
Clearwater, FL 33756 |
7/31/2009 4:00 PM |
|
Project Manager: George E. McKibben 727/562-4634 |
View |
CUSTODIAL SERVICES - MUNICIPAL SERVICES BUILDING AND PARKING GARAGE (BID 19-09) |
6/22/2009 |
Mandatory: 7/15/2009 1:00 PM Municipal Services Building
100 South Myrtle Avenue
Clearwater, FL 33756 |
7/29/2009 11:00 AM |
|
Project Manager: Pete Hegedus
727/562-4890 Ext. 2813 |
View |
ANNUAL INDEPENDENT CPA AUDIT (RFP/Q 20-09) |
6/3/2009 |
|
7/9/2009 4:00 PM |
|
Project Manager: George E. Mckibben 727.562.4634 |
View |
Engineering Projects Ready to Bid
The complete packages for Engineering Projects can be obtained from our Plan Room. Creating a free personal account will be required for first time Visitors.
Prospective bidders on Engineering Projects must be pre-qualified to submit a bid. Public Services Department is responsible for the pre-qualification process. Contractors wanting to pre-qualify to bid projects as a General Contractor must do so two weeks (ten business days) prior to the bid opening date.
Project Title (Number) |
Dates Available |
Pre-Bid Conference |
Opening Date/Time |
Date of Award |
Notes |
Order Plans & Specs |
ENTERPRISE DOG PARK PARKING LOT (07-0017-PR) |
6/30/2009 - 7/24/2009 |
Mandatory: 7/14/2009 10:00 AM 100 S MYRTLE AVENUE, CONFERENCE ROOM 130, CLEARWATER, FLORIDA |
7/29/2009 1:30 PM |
8/20/2009 |
Maintaining of silt fencing and tree barricades installed by others during construction period, rough and fine grading and work associated with asphalt parking lot and retention pond construction, in conjunction with the storm sewer system, PVC water line, PVC sleeves for irrigation & electrical work, installation Bahia sod of the retention pond. A complete bidders package containing plans, specifications, bond forms, contract form, affidavits and proposal form is available to the general public (Contractors, Sub-contractors, suppliers, vendors, etc.) for review and purchase. However, sealed proposals will only be accepted from those Contractors that are currently City pre-qualified Contractors in the construction category of Roadway & Parking Lot Construction with a minimum pre-qualification amount of $100,000.00. Project Manager: LEROY CHIN
PARKS & RECREATION (727) 562-4856 |
Plan Room |
ALLIGATOR CREEK CHANNEL F IMPROVEMENTS (03-0028-EN) |
6/26/2009 - 7/10/2009 |
Mandatory: 7/6/2009 1:00 PM 100 S. MYRTLE AVENUE, ROOM 130, CLEARWATER, FLORIDA |
7/15/2009 1:30 PM |
8/6/2009 |
Construction to improve the drainage of Channel F from Old Coachman Road to approximately 1500 feet upstream and a small section of channel near Beville Road. The major work consists of: realigning approximately 850 feet of the channel to the historical flow path within the City’s public utility easement; reinforcing and stabilizing the channel through the installation of approximately 1500 linear feet of gabion structures; reinforcing and stabilizing the channel near Beville Road through the installation of approximately 280 linear feet of gabion structures; replacing the existing culverts under Old Coachman Rd and Wetherington Rd.; reconstructing and paving the disturbed areas of Old Coachman Rd and Wetherington Rd.; removing a culvert, 150 feet downstream from Wetherington RdA complete bidder’s package containing plans, specifications, bond forms, contract form, affidavits and proposal form is available only to City pre-qualified contractors in the construction category of EXCAVATION/SITEWORK/CHANNEL STABILIZATION/STORMWATER FACILITIES with a minimum pre-qualification amount of $2,500,000.00.. Project Manager: ALLISON MCKINNEY, P. E. (727) 562-4815 Consultant: CHRISTINE MEHLE, P. E., JONES EDMUNDS (813) 258-0703 |
Plan Room |
Bid Tabulations
Purchasing Division Closed Bid Tabulations
| Project Title |
Date of Opening |
Date of Award |
Bid Tabulation |
33 CUBIC YARD TOP LOADING RECYCLING BODY MOUNTED ON A STAND UP RIGHT HAND DRIVE CHASSIS (BID 13-09) |
4/15/2009 |
|
View |
CLEARWATER UTILITY RATE STUDY (RFP 15-09) |
6/1/2009 |
|
View |
ENGINEER OF RECORD (RFQ 12-09) |
5/27/2009 |
|
View |
ENGINEER OF RECORD (RFQ 12-09) |
5/27/2009 |
|
View |
ENGINEER OF RECORD (RFQ 12-09) |
5/27/2009 |
|
View |
FUEL: HIGH SULPHUR (RED DYE) DIESEL (BID 17-09) |
4/30/2009 |
|
View |
HUMAN TRAFFICKING PSA AND VIDEO PROJECT (RFP 16-09) |
4/30/2009 |
|
View |
PALM PRUNING CONTRACT (BID 18-09) |
6/26/2009 |
|
View |
PALM PRUNING CONTRACT (BID 18-09) |
6/26/2009 |
|
View |
PARKING CONSULTING SERVICES - DOWNTOWN AND BEACH PUBLIC PARKING FACILITIES (RFQ 09-09) |
3/9/2009 |
|
View |
PENSION INVESTMENT MEASUREMENT AND CONSULTING SERVICE (RFP 11-09) |
4/6/2009 |
|
View |
Engineering Closed Bid Tabulations
| Project Title |
Date of Opening |
Date of Award |
Bid Tabulation |
SKYCREST RCW PROJECT - CONTRACT 1: BOOSTER PUMP STATION (07-0013-UT) |
6/18/2009 |
7/16/2009 |
View |
|